A collection of textile samples lay spread out on the table – Samsa was a travelling salesman – and above it there hung a picture that he had recently cut.
The Catholic Archdiocese of Nairobi had completed a nine storey office block, which is fully occupied. However due to demand for more office space in the CBD, the client decided to construct more offices for rent, next to the completed offices.
Description:
This is a 9 storey office building with one basement. The building is located at the Holy Family Minor BasilicaThis is a Development of mix urban use on Gitanga Road which will comprise of the following: 530 Parking spaces,60,000 sq feet of supermarket, Shops and Coffee houses, Offices Serviced apartments with conference rooms, swimming pool and gymnasium.
The project involves the Fit out of the 7th, 8th and 9th floor at Cardinal Otun ga Plaza at Holy Family Minor Basilica The project include, partition works, security CCTV and Access Control, ICT installation and data cabling, Air Conditioning, building management system , and UPS Installation. The works are complete and in use.
Description: The project is designed as a hotel. It has a total of 40 self contained rooms, squash courts, gymnasium, swimming pool, dining facilities and recreational facilities.The project is designed to give a homely environment, fit for recreation and allow one to recuperate.
the project comprising of :– basements parking, levels above ground parking and levels of offices in two wings with high speed lifts.
consists of, Three bedroom units – 720 ,Two Bedroom unit – 960, One bedroom unit – 180 a Shopping Complex, School. Total NO. of units – 1,860
Total NO. of units – 3,168
Phase 1 has already been complete at a cost of 80 million shillings. The hospital is planned on a 15 year program and on completion should accommodate 200 beds and serve as a referral hospital as well.
The Hospital is the 2nd largest in Thika district and serves a wide clientele. The only other hospital nearby with equal capacity is Thika District Hospital.
We have been the hospital consultants and have successfully completed the following projects on a long term basis.
Wajir district hospital is a government level 4 hospital, that was ear marked for upgrading to bring better and quality health care closer to the people of northern Kenya .
The brief involved expansion and equipping of the current dilapidated facilities. It involved the following works-:This was our first hospital project as a firm in the year 2007. Like all hospitals Jamaa hospital is also engaged in expanding and improving its facilities to cater for the expanding clientele. We were engaged in renovations of the theaters to modern standards. This involved redoing the existing two theaters plus the theater associated facilities. The hospital is also run by Sisters of our lady of Charity and is located in the Eastland’s part of the City
The project is a Church development with a capacity of over 5,000. It is designed on 3 levels due to the site slope, with the lower ground having a chapel, and bookshop.The Upper ground has, chapel of Devine Mercy, chapel of Rosary, sacristy, offices and the main Church hall.The balcony floor can sit about 1000 persons, with Galleries and other chapels.
Location: Khadija Estate, Mombasa Status: Design stage Description: Total NO. of units – 2,522
The project was designed with a basement for future car parking, ground floor for the main sanctuary, with side chapels to sit 1,000 people and a balcony that can sit 300, and include side chapels, feeding mothers room and a sound control room.
Description: The project involved the design of a student’s hostels, dining facilities, chapel, sisters’ convent and staff quarters. We were involved in the design and part supervision of the construction works..
Mater also realized a need for a pediatric waiting and observation area for children that would also separate them from the adults waiting area.
We were therefore mandated to create a child friendly place where children can play and wait, play and be under observation, play and get consultations. This made dealing with the patient child much easier.
The mortuary unit comprises of the following: Level 1: Admission area, preservation area, embalming area, autopsy area, cold storage room for mass body storage, waiting and viewing areas, reception, prayer facilities, Counseling rooms, and personnel facilities. Level 2: Forensic Laboratory Level 3: Administrative work spaces for funeral home and forensic lab staff, meeting rooms and workstations for facility, police & legal personnel, meeting rooms for families, learning rooms, document storage, records office, staff rest rooms and parking
The project involved the design of a student’s hostels, dining facilities, chapel, sisters’ convent and staff quarters. We were involved in the design and part supervision of the construction works.
The Development has 1800 units of one bedroom, two bedroom and three bedrooms. In addition there’s a kindergarten, Shopping Centre and Parking Silos.
It is modelled around the live, work and Play Model of development.
Luna Villas comprises of 10 town house on Ndoto road Lavington. The town houses are 3 bedroom all self contained with an en-suite guest room on ground floor. An attic floor was provided as extra utility space. The project was completed in 2004.
Luna gardens are located in the quite serene environment of lavington with a river frontage. The houses have a plinth area of between 370 and 400 square meters. The houses are 17in total and of three different types within a plot of 4.5 acre with a club house and swimming pool, strategically located by the river.
Gravelia Westlands comprises of 6 number town houses on a sloppy site, with each houses having a plinth area of 390 square metres. The houses are semi detached and have an attic space provided to maximize on usable space, since the plot was tight. The project cost 140 million.
Pumwani Hospital is an Obstetric and referral hospital for delivery of expectant mothers in Nairobi and adjoining districts 10 Storey new maternitPumwani Hospital is an Obstetric and referral hospital for delivery of expectant mothers in Nairobi and adjoining districts 10 Storey new maternity wing providing 450 bed capacity, Complete refurbishment of existing hospital premises, Staff housing apartments of 8 storey each, 4 storey tuition block- school of midwifery, 6 storey hostel block, Single storey Mortuary block